Watershed - Somo River (UW35)
Somo River Watershed

Details

The Somo River Watershed is located in Lincoln, Oneida and Price counties. It is 90,435 acres in size and contains 168 miles of streams and rivers, 643 acres of lakes and 31,815 acres of wetlands. The watershed is dominated by forest (52%) and wetlands (35%) and is ranked low for nonpoint source issues affecting water quality.

Date  2010

Ecological Landscapes for Somo River Watershed

Ecological Landscapes

The Somo River Watershed is primarily located in the North Central Forest Ecological Landscape which occupies much of the northern third of Wisconsin. Its landforms are characterized by end and ground moraines with some pitted outwash and bedrock controlled areas. Kettle depressions and steep ridges are found in the northern portion. Two prominent areas in this Ecological Landscape are the Penokee-Gogebic Iron Range in the north extending into Michigan, and Timm's Hill, the highest point in Wisconsin (1,951 feet) in the south. Soils consist of sandy loam, sand, and silts. The vegetation is mainly forest, with many wetlands and some agriculture, though the growing season is not as favorable as it is in southern Wisconsin. Lake Superior greatly influences the northern portion of the Ecological Landscape especially during the winter season, producing greater snowfall than in most areas in Wisconsin. The historic vegetation was primarily hemlock-hardwood forest dominated by hemlock, sugar maple, and yellow birch. There were some smaller areas of white and red pine forest scattered throughout the Ecological Landscape, and individual white pines trees were a component of the hemlock-hardwood forest. Harvesting hemlock to support the tanneries was common at the turn of the century, and the species soon became a minor component of forests due to over-harvesting and lack of regeneration. Currently, forests cover approximately 80% of this Ecological Landscape. The northern hardwood forest is dominant, made up of sugar maple, basswood, and red maple, and also including some scattered hemlock and white pine pockets within stands. The aspen-birch forest type group is also relatively abundant, followed by spruce-fir. A variety of wetland community types also are present, both forested and non-forested.

Date  2010

Watershed Grants
Grant Details
Aquatic Invasives Control
Date
10/1/2008
Waters Involved
Lake Mohawksin
Status
Complete

Friends Of Lake Mohawksin: Lake Mohawksin Ais Control & Prevention Project: Friends of Lake Mohawksin is sponsoring an AIS ACEI grant on Lake Mohawksin in Lincoln County. Project partners include Wisconsin Public Service and Packaging Corp. of America and will focus on EWM management, and AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 50 acres and have a density rating below D=1 which will allow the Friends of Lake Mohawksin to continue management of AIS with minimal state financial assistance. This initial grant will be used to begin implementation of the four year plan.

Project activities include: 1) Annual chemical treatments of EWM; 2) Volunteer hand removal of isolated EWM plants; 3) Annual Pre and Post treatment monitoring and analysis; 4) Kick-off meeting and volunteer AIS training; 5) Annual volunteer monitoring; 6) Recruit volunteers and expand current CB/CW program; 7) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 8) Point-intercept aquatic plant survey and 1 set of voucher specimens; 9) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre and post treatment survey data; 3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 4) Aquatic plant survey data and 1 set of vouchers; 5) AIS educational, prevention and monitoring activities; 6) A minimum of 100 volunteer hours of monitoring and 400 hours of CB/CW; 7) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and educational activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, point-intercept data, set of vouchers, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Lake Mohawksin
Status
Complete

Friends Of Lake Mohawksin: Lake Mohawksin Ais Control & Prevention Project, Phase 2: Friends of Lake Mohawksin is sponsoring an AIS control project on Lake Mohawksin with project partner Wisc. Public Service & Packaging Corporation of America. This is the second phase (years 3 and 4) of a four year project focusing on EWM management, AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 50 acres and have a density rating below D=1.

Activities include: 1) Annual chemical treatments of EWM; 2) Volunteer hand removal of isolated EWM plants; 3) Annual Pre and Post treatment monitoring and analysis; 4) Kick-off meeting, volunteer AIS training and attendance at sport show; 5) Annual volunteer monitoring and residual monitoring; 6) Purple Loosestrife (PL) control program; 7) Recruit volunteers and expand current CB/CW program; 8) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 9) Point-intercept aquatic plant survey and 1 set of voucher specimens; 10) Develop annual project report and a final report.

Deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre and post treatment survey data; 3) PL control; 4) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 5) Aquatic plant survey data and 1 set of vouchers; 6) AIS educational, prevention and monitoring activities; 7) A minimum of 100 volunteer hours of monitoring and 400 hours of CB/CW; 8) Annual reports and final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.

Specific Conditions: Annual reports and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, point-intercept data, set of vouchers, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
10/1/2008
Waters Involved
Wisconsin River
Status
Complete

Friends Of Lake Mohawksin: Lake Mohawksin Ais Control & Prevention Project: Friends of Lake Mohawksin is sponsoring an AIS ACEI grant on Lake Mohawksin in Lincoln County. Project partners include Wisconsin Public Service and Packaging Corp. of America and will focus on EWM management, and AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 50 acres and have a density rating below D=1 which will allow the Friends of Lake Mohawksin to continue management of AIS with minimal state financial assistance. This initial grant will be used to begin implementation of the four year plan.

Project activities include: 1) Annual chemical treatments of EWM; 2) Volunteer hand removal of isolated EWM plants; 3) Annual Pre and Post treatment monitoring and analysis; 4) Kick-off meeting and volunteer AIS training; 5) Annual volunteer monitoring; 6) Recruit volunteers and expand current CB/CW program; 7) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 8) Point-intercept aquatic plant survey and 1 set of voucher specimens; 9) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre and post treatment survey data; 3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 4) Aquatic plant survey data and 1 set of vouchers; 5) AIS educational, prevention and monitoring activities; 6) A minimum of 100 volunteer hours of monitoring and 400 hours of CB/CW; 7) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and educational activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, point-intercept data, set of vouchers, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Wisconsin River
Status
Complete

Friends Of Lake Mohawksin: Lake Mohawksin Ais Control & Prevention Project, Phase 2: Friends of Lake Mohawksin is sponsoring an AIS control project on Lake Mohawksin with project partner Wisc. Public Service & Packaging Corporation of America. This is the second phase (years 3 and 4) of a four year project focusing on EWM management, AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 50 acres and have a density rating below D=1.

Activities include: 1) Annual chemical treatments of EWM; 2) Volunteer hand removal of isolated EWM plants; 3) Annual Pre and Post treatment monitoring and analysis; 4) Kick-off meeting, volunteer AIS training and attendance at sport show; 5) Annual volunteer monitoring and residual monitoring; 6) Purple Loosestrife (PL) control program; 7) Recruit volunteers and expand current CB/CW program; 8) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 9) Point-intercept aquatic plant survey and 1 set of voucher specimens; 10) Develop annual project report and a final report.

Deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre and post treatment survey data; 3) PL control; 4) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 5) Aquatic plant survey data and 1 set of vouchers; 6) AIS educational, prevention and monitoring activities; 7) A minimum of 100 volunteer hours of monitoring and 400 hours of CB/CW; 8) Annual reports and final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.

Specific Conditions: Annual reports and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, point-intercept data, set of vouchers, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Early Detection and Response
Date
5/1/2014
Waters Involved
Lake Mohawksin
Status
Complete

Friends Of Lake Mohawksin: Lake Mohawksin Ais Early Detection & Response Project - Clp: During the summer of 2013 Curly-Leaf Pondweed (CLP) was found in Lake Mohawksin at low densities. This project addresses the pioneer CLP through monitoring and volunteer based hand harvesting activities.

The project includes the following goals: 1) Early season AIS survey; 2) Hand removal coordination and GPS base map creation; 3) Volunteer based surveillance monitoring and hand removal; 4) Late summer follow up AIS survey.

Project deliverables include: 1) Annual AIS monitoring report; 2) A final report will be completed discussing the results of the three years of surveys, success of hand pulling and a control strategy targeting AIS within Lake Mohawksin.

Specific conditions for this Project: 1) The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project; 2) Make sure lake association members are informed about this project.


Grant Details
Aquatic Invasives Early Detection and Response
Date
5/1/2014
Waters Involved
Wisconsin River
Status
Complete

Friends Of Lake Mohawksin: Lake Mohawksin Ais Early Detection & Response Project - Clp: During the summer of 2013 Curly-Leaf Pondweed (CLP) was found in Lake Mohawksin at low densities. This project addresses the pioneer CLP through monitoring and volunteer based hand harvesting activities.

The project includes the following goals: 1) Early season AIS survey; 2) Hand removal coordination and GPS base map creation; 3) Volunteer based surveillance monitoring and hand removal; 4) Late summer follow up AIS survey.

Project deliverables include: 1) Annual AIS monitoring report; 2) A final report will be completed discussing the results of the three years of surveys, success of hand pulling and a control strategy targeting AIS within Lake Mohawksin.

Specific conditions for this Project: 1) The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project; 2) Make sure lake association members are informed about this project.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Mohawksin
Status
Complete

Lincoln County: Lk. Mohawksin Treatment Monitoring, Planning & Education Project: Lincoln County Conservation Department is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Pre-treatment and post-treatment surveys
5) Purchase a DO meter
6) DO monitoring in treatment areas
7) Informational meeting and treatment monitoring results meeting

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) DO meter
3) Final report summarizing CB/CW activities, AIS monitoring, pre and post treatment monitoring, meetings, GPS locations, and guidance for continued control actions

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Somo River
Status
Complete

Lincoln County: Lk. Mohawksin Treatment Monitoring, Planning & Education Project: Lincoln County Conservation Department is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Pre-treatment and post-treatment surveys
5) Purchase a DO meter
6) DO monitoring in treatment areas
7) Informational meeting and treatment monitoring results meeting

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) DO meter
3) Final report summarizing CB/CW activities, AIS monitoring, pre and post treatment monitoring, meetings, GPS locations, and guidance for continued control actions

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Wisconsin River
Status
Complete

Lincoln County: Lk. Mohawksin Treatment Monitoring, Planning & Education Project: Lincoln County Conservation Department is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Pre-treatment and post-treatment surveys
5) Purchase a DO meter
6) DO monitoring in treatment areas
7) Informational meeting and treatment monitoring results meeting

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) DO meter
3) Final report summarizing CB/CW activities, AIS monitoring, pre and post treatment monitoring, meetings, GPS locations, and guidance for continued control actions

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Alice Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Bass Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Bass Lake T37n R09e S30
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Bear Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Bearskin Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
8/1/2000
Waters Involved
Bearskin Lake
Status
Complete

Big Bearskin Lake Association: Res-Big Bearskin Lake Improvement Program: The Big Bearskin Lake Association will conduct a lake water quality improvement program with the goal of increasing water clarity and resulting sechi disc readings This project will use barley straw to inhibit blue-green algae growth in the lake. Anticipated results include improvement in water transparency and aquatic plant growth and distribution through out the lake.

Specific activities of this project include the installation of the straw bales, water quality monitoring, and aquatic plant survey, and development of a final report.

Specific deliverables for this grant project will include:
final report

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Bertram Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Boom Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Box Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
9/1/2002
Waters Involved
Butternut Lake
Status
Complete

Price County: Lmi-Phase Ii Butternut Wq Assessment/Modeling: The Price County Land Conservation Dept will sponsor a project which will collect all needed data to create a response model for Butternut Lake including a water budget, detailed phosphorus budget, lake water quality modeling and evaluation of groundwater impacts. Deliverables will include all data collected and a final report summarizing the findings.

DNR will be provided with a copy of reports and publications produced in both written and electronic (PDF) format. DNR will also be provided with a summary of all the efforts under this grant that are not included in reports or other written documents.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Clear Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Crystal Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Dollar Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Douglas Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Doyle Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Dugout Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Foster Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Garth Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
10/28/1997
Waters Involved
Hanson Lake
Status
Complete

City Of Rhinelander: Acq-Hanson Lake Land Acquisition: City of Rhinelander will acquire ~16 acres of land with 428.65 feet of frontage on Hanson Lake. The acquisition will help protect the lake from some current shoreland erosion. This acquisition will also provide passive recreation when plans are completed to make the property part of the park system.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Hughitt Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Katherine Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Kitty Springs
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Lake Creek
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
3/15/2023
Waters Involved
Lake Mohawksin
Status
Complete

Friends Of Lake Mohawksin: Hlr - Lake Mohawksin Native Plantings: Partnering with property owners, the Friends of Lake Mohawksin is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
The grantee may request a one-time cost amendment and a one-time time extension. The grantee must notify the department if they wish to add or subtract practices to the scope of this grant agreement.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Lake Seventeen
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Lee Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Little Bertram Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Lost Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Lower Kaubashine Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
McCormick Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Miller Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Minnow Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Moen Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Mud Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
9/1/1999
Waters Involved
Muskellunge Lake
Status
Complete

Muskellunge Lake Protection & Rehab District: Res- Muskellunge Lake Fish Habitat Improvement: The District will implement recommendations from an earlier Planning Grant project by constructing and placing 27 fish habitat shelters and snags on the bed of the lake.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Myrtle Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Pine Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
9/1/2000
Waters Involved
Pixley Flowage
Status
Complete

Price County: Acq-Price County-Smith Lake Land Acquisition: Price County will acquire 93.5 acres of land with 6,800 feet of undeveloped frontage on Smith Lake, a flowage of the Flambeau River.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Rhinelander Flowage
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Rocky Run Springs
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Round Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Scott Springs
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Second Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Shepard Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Silver Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Silver Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
South Blue Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
South Pine Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Squash Lake
Status
Complete

Squash Lake Assoc: Hlk-Squash Lake Healthy Lakes Initiative: Squash Lake Association will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: fish sticks on 1 property and a 350 ft2 native planting, rain garden, and rock infiltration practice on 1 property.

The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #17 is required.

The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.

Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Swartz Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Sylvan Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Third Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Thunder Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Tomahawk Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Twin Lakes
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Un Spring
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Un Spring
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Unnamed
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Unnamed
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Upper Kaubashine Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Lake Protection Grant
Date
3/15/2023
Waters Involved
Wisconsin River
Status
Complete

Friends Of Lake Mohawksin: Hlr - Lake Mohawksin Native Plantings: Partnering with property owners, the Friends of Lake Mohawksin is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
The grantee may request a one-time cost amendment and a one-time time extension. The grantee must notify the department if they wish to add or subtract practices to the scope of this grant agreement.


Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Wood Curt Lake
Status
Complete

Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.

Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.

Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Yawkey Lake
Status
Complete

Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Lake Mohawksin
Status
Complete

City Of Tomahawk: Lake Mohawksin Comprehensive Mgt. Planning Project Phase I: The City of Tomahawk is sponsoring phased large scale lake planning grants to study Lake Mohawksin in Lincoln County with a study completion date of June 30, 2008. Friends of Lake Mohawksin Association is a project partner. The project will focus on developing a Lake Management Plan (LMP) for Lake Mohawksin. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 3), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling following CLMN protocols (Secchi, P, Chla)
3) Curly-leaf pondweed survey
4) Aquatic plant community mapping and analysis
5) Fisheries assessment
6) Watershed assessment
7) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Lake Mohawksin
Status
Complete

City Of Tomahawk: Lake Mohawksin Comprehensive Planning Project Phase Ii: The City of Tomahawk is sponsoring phased large scale lake planning grants to study Lake Mohawksin in Lincoln County with a study completion date of June 30, 2008. Friends of Lake Mohawksin Association is a project partner. The project will focus on developing a Lake Management Plan (LMP) for Lake Mohawksin. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 3), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling following CLMN protocols (Secchi, P, Chla)
3) Curly-leaf pondweed survey
4) Aquatic plant community mapping and analysis
5) Fisheries assessment
6) Watershed assessment
7) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Somo River
Status
Complete

City Of Tomahawk: Lake Mohawksin Comprehensive Mgt. Planning Project Phase I: The City of Tomahawk is sponsoring phased large scale lake planning grants to study Lake Mohawksin in Lincoln County with a study completion date of June 30, 2008. Friends of Lake Mohawksin Association is a project partner. The project will focus on developing a Lake Management Plan (LMP) for Lake Mohawksin. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 3), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling following CLMN protocols (Secchi, P, Chla)
3) Curly-leaf pondweed survey
4) Aquatic plant community mapping and analysis
5) Fisheries assessment
6) Watershed assessment
7) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Somo River
Status
Complete

City Of Tomahawk: Lake Mohawksin Comprehensive Planning Project Phase Ii: The City of Tomahawk is sponsoring phased large scale lake planning grants to study Lake Mohawksin in Lincoln County with a study completion date of June 30, 2008. Friends of Lake Mohawksin Association is a project partner. The project will focus on developing a Lake Management Plan (LMP) for Lake Mohawksin. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 3), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling following CLMN protocols (Secchi, P, Chla)
3) Curly-leaf pondweed survey
4) Aquatic plant community mapping and analysis
5) Fisheries assessment
6) Watershed assessment
7) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Tomahawk River
Status
Complete

City Of Tomahawk: Lake Mohawksin Comprehensive Mgt. Planning Project Phase I: The City of Tomahawk is sponsoring phased large scale lake planning grants to study Lake Mohawksin in Lincoln County with a study completion date of June 30, 2008. Friends of Lake Mohawksin Association is a project partner. The project will focus on developing a Lake Management Plan (LMP) for Lake Mohawksin. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 3), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling following CLMN protocols (Secchi, P, Chla)
3) Curly-leaf pondweed survey
4) Aquatic plant community mapping and analysis
5) Fisheries assessment
6) Watershed assessment
7) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Tomahawk River
Status
Complete

City Of Tomahawk: Lake Mohawksin Comprehensive Planning Project Phase Ii: The City of Tomahawk is sponsoring phased large scale lake planning grants to study Lake Mohawksin in Lincoln County with a study completion date of June 30, 2008. Friends of Lake Mohawksin Association is a project partner. The project will focus on developing a Lake Management Plan (LMP) for Lake Mohawksin. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 3), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling following CLMN protocols (Secchi, P, Chla)
3) Curly-leaf pondweed survey
4) Aquatic plant community mapping and analysis
5) Fisheries assessment
6) Watershed assessment
7) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Wisconsin River
Status
Complete

City Of Tomahawk: Lake Mohawksin Comprehensive Mgt. Planning Project Phase I: The City of Tomahawk is sponsoring phased large scale lake planning grants to study Lake Mohawksin in Lincoln County with a study completion date of June 30, 2008. Friends of Lake Mohawksin Association is a project partner. The project will focus on developing a Lake Management Plan (LMP) for Lake Mohawksin. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 3), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling following CLMN protocols (Secchi, P, Chla)
3) Curly-leaf pondweed survey
4) Aquatic plant community mapping and analysis
5) Fisheries assessment
6) Watershed assessment
7) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Wisconsin River
Status
Complete

City Of Tomahawk: Lake Mohawksin Comprehensive Planning Project Phase Ii: The City of Tomahawk is sponsoring phased large scale lake planning grants to study Lake Mohawksin in Lincoln County with a study completion date of June 30, 2008. Friends of Lake Mohawksin Association is a project partner. The project will focus on developing a Lake Management Plan (LMP) for Lake Mohawksin. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 3), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling following CLMN protocols (Secchi, P, Chla)
3) Curly-leaf pondweed survey
4) Aquatic plant community mapping and analysis
5) Fisheries assessment
6) Watershed assessment
7) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Wisconsin River - Unnamed Slough
Status
Complete

City Of Tomahawk: Lake Mohawksin Comprehensive Mgt. Planning Project Phase I: The City of Tomahawk is sponsoring phased large scale lake planning grants to study Lake Mohawksin in Lincoln County with a study completion date of June 30, 2008. Friends of Lake Mohawksin Association is a project partner. The project will focus on developing a Lake Management Plan (LMP) for Lake Mohawksin. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 3), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling following CLMN protocols (Secchi, P, Chla)
3) Curly-leaf pondweed survey
4) Aquatic plant community mapping and analysis
5) Fisheries assessment
6) Watershed assessment
7) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Wisconsin River - Unnamed Slough
Status
Complete

City Of Tomahawk: Lake Mohawksin Comprehensive Planning Project Phase Ii: The City of Tomahawk is sponsoring phased large scale lake planning grants to study Lake Mohawksin in Lincoln County with a study completion date of June 30, 2008. Friends of Lake Mohawksin Association is a project partner. The project will focus on developing a Lake Management Plan (LMP) for Lake Mohawksin. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 3), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling following CLMN protocols (Secchi, P, Chla)
3) Curly-leaf pondweed survey
4) Aquatic plant community mapping and analysis
5) Fisheries assessment
6) Watershed assessment
7) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment, and all maps from project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Duroy Lake
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Elk Lake
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Elk River
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Grassy Lake
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Lac Sault Dore
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Long Lake
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Musser Flowage
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Unnamed
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
Somo River Watershed
Watershed Recommendations
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
11/4/2011
Proposed
Projects
 
Somo River WatershedWatershed History Note